
Prices for Foundation and Structure of a House
The average cost for building a house structure is around 130 €/m². The final price will depend mainly on the type of material used (wood can significantly increase this price) and the conditions imposed by the terrain based on its characteristics.
The amounts are indicative and come from the original imported guide. The final budget depends on the scope, materials, and prior condition of the space.
Foundation and Structure Pricing Guide for Home Construction
Comprehensive pricing tiers for foundation and structural work in residential construction. Prices are based on current Spanish market rates and include labor, materials, and basic permits. Final costs may vary based on soil conditions, location, and specific project requirements.
Básico/Basic
Essential foundation and structural work for small residential projects or budget-conscious builds. Includes standard shallow foundations suitable for stable soil conditions.
Estándar/Standard
Comprehensive foundation and structural solution for typical residential homes. Includes reinforced concrete slab foundation with proper drainage and structural reinforcement for 2-3 story buildings.
Premium
Advanced foundation and structural engineering for complex residential projects. Includes deep foundations, seismic reinforcement, and specialized structural solutions for challenging soil or multi-story buildings.
Share your project details and get free contact with professionals who work on similar projects.
Prices for home structures
See what homeowners usually pay for the most common tasks. Use these ranges to fine-tune your scope and avoid missing key items in your budget.
Reinforced concrete beam structure
Masonry wall structure
Solid concrete slab structure
Steel frame structure
Wooden structure
Important factors when building a single-family home structure with Reformia
The average cost to build a house structure is around 130 €/m². The final price will depend, basically, on the type of material used (wood can significantly raise this price) and on the conditions imposed by the land according to its characteristics.

1. Consider the local climate
The climate of the area can be an important factor when choosing the type of structure and the most suitable material for building a house. Rainfall, temperatures, solar radiation, and environmental humidity affect all elements of a building.

2. Waterproof the house structure
Humidity conditions are an important factor when designing the structure of a new building. Structural moisture, produced by capillarity, can end up putting the stability of the building at risk. And interior humidity can also generate problems.

3. Consider the building's intended use
The purpose of the building is important when choosing the structural material. In fact, the Basic Document SE establishes the basic safety requirements regarding resistance and stability that structures in new construction must meet according to the building's use. In this sense, the foreseen loads are what is taken into account, and these will be different depending on whether the use is residential, industrial, or commercial.
The average cost to build a house structure is around 130 €/m². The final price will depend, basically, on the type of material used (wood can significantly raise this price) and on the conditions imposed by the land according to its characteristics.
What is usually included in a quote
Each professional may structure quotes differently, but most project budgets follow this logic.
Typically included
Often not included
Process Steps
The average cost to build a house structure is around 130 €/m². The final price will depend, basically, on the type of material used (wood can significantly raise this price) and on the conditions imposed by the land according to its characteristics.

1. Site Survey and Soil Analysis
A professional engineer conducts a topographical survey and soil study to determine soil bearing capacity, drainage conditions, and foundation type requirements. This analysis is crucial for Spanish building codes (CTE) compliance and costs typically €300-€800 depending on property size.

2. Foundation Design and Permits
Based on soil analysis, a structural engineer designs the appropriate foundation system (zapatas aisladas, losa de cimentación, o pilotes) and obtains building permits from local authorities. This step ensures compliance with regional construction regulations and takes 2-4 weeks.

3. Excavation and Ground Preparation
Heavy machinery excavates to the required depth, removes unsuitable soil, and prepares the base level. Proper compaction and drainage systems are installed. Costs vary significantly based on soil conditions and depth required, typically €15-€30 per cubic meter in Spain.

4. Foundation Construction
Reinforced concrete foundations are poured according to specifications. This includes formwork installation, steel rebar placement, concrete mixing, pouring, and curing. This is the most critical phase and usually takes 3-6 weeks depending on foundation type and weather conditions.
What can change your final price
Even similar projects can end with different budgets. These are the factors that most often push costs up or down.
Type of structural material
The choice between reinforced concrete, steel, timber, or mixed systems significantly impacts pricing. Timber can increase costs by 40-60% compared to standard concrete due to required treatment and certifications.
Geotechnical site characteristics
Soil bearing capacity, water table level, presence of rock or clay determine the required foundation depth. Poor soil conditions can double costs when piling or specialized foundations are needed.
Architectural complexity of the structure
Properties with irregular floor plans, significant overhangs, basements, or unique structures require more complex engineering calculations and additional materials, increasing the budget by 20-35%.
Required preliminary studies and permits
Geotechnical study, technical project, structural calculations, and municipal permit management vary by location. Seismic risk or flood-prone zones require stricter regulations that increase construction costs.

How much does it cost to build a house structure?
The average cost to build a house structure is around 130 €/m². The final price will depend, basically, on the type of material used (wood can significantly raise this price) and on the conditions imposed by the land according to its characteristics.
The price of building a house structure will depend on both the square meters and the materials used as well as the architectural design. In general, the structure of a single-family home is composed of the following elements:
Procedures and licenses to build a house structure
The average cost to build a house structure is around 130 €/m². The final price will depend, basically, on the type of material used (wood can significantly raise this price) and on the conditions imposed by the land according to its characteristics.
Generately, the price of the foundation to build a 120 m² single-story house on level ground without need for formwork can be around 12,000 €; if it includes formwork the price could rise to around 14,000 €.
The construction of the structure including interior partitions and walls, facades, door and window openings, etc. can cost around 800 €/m², although the price will vary depending on each project.
- Foundation: this is the first element in the construction of a house, consisting of pouring concrete on which the house will rest and which supports all its weight.
- Pillars and load-bearing walls: these are the vertical elements that transmit loads to the foundation.
- Beam and tie-rod framework: forms the horizontal elements of the house, which transmit loads to the walls.
- Floor slabs: these are the floors of the structure, which distribute weight toward the beams, walls, and columns.
Once you have the land, the first thing to do is hire an architect and surveyor who will oversee the new construction from its layout to its execution and legalization. The architect will be responsible for drafting the basic project, which is what the City Hall will require to grant the urban planning license. This license is essential, but it should not be confused with the building permit.
Next, a geotechnical study must be carried out and the project must be approved by the architect, which must be endorsed by the corresponding Association of Architects. With this documentation, you can already request the building permit.
Once construction begins, the layout deed is signed, which is the document that certifies that the project can actually be carried out.
- Roof: elements that make up the house's roof.
- Building a reinforced concrete structure for a home with ground floor of 90 m² and second floor of 60 m²: 12,000 €.
- Foundation and structure for a 100 m² home: 30,000 €.
- Single-family home structure with basement of 180 m², ground floor and first floor of 145 m², and terrace with a room of 30 m²: 80,000 €.
A platform built equally for homeowners and professionals
Whether you're planning a renovation or looking for your next project, Reformia gives both sides the tools to connect, compare, and collaborate with confidence.
For individuals
For professionals

Demystify home renovation costs
Access clear price ranges for services and installations in your area, then create a request with realistic expectations.
Energy Suppliers

Aggregate range based on the published guides in this family, including project totals and unit pricing where relevant.
Construction

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Installers

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Maintenance

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Moving Services

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Minor Works

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Renovations

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Technical Services

Aggregate range based on the published guides in this family, including project totals, hourly pricing, and unit pricing where relevant.
Retail & Assembly

Aggregate range based on the published guides in this family.
Frequently Asked Questions

How much does the foundation and structure of a house typically cost?
The average cost is around 130 €/m² of built area, though it can vary significantly depending on the type of structure and materials used. For a single-family home of 150 m², the total budget could range between 19,500 € and 35,000 € depending on whether reinforced concrete, steel, or wood is used. Timber structures tend to be more expensive, increasing the final price by 40-50% compared to conventional concrete structures.
What factors have the most impact on the final price of the structure?
The main factors are the type of material chosen (concrete, steel, or wood), the geotechnical characteristics of the land, and the need for specialized foundation work. The soil type may require deeper foundations or additional reinforcements, which significantly increases costs. The complexity of the design, accessibility of the plot, and local climate conditions also play an important role.
How long does it take to build a house structure?
The average timeframe ranges between 4 and 8 weeks, depending on the complexity and size of the home. The foundation typically requires 2-3 weeks, while erecting the main structure takes another 3-5 weeks. Factors such as adverse weather conditions, soil quality, or supply delays can significantly extend these timelines.
Do I need a building permit to construct the structure?
Yes, it is mandatory to obtain a building permit before starting any foundation and structural work. You must submit a technical project signed by a licensed engineer to your local municipality, along with the required cadastral and planning documentation. Processing time varies by municipality, but typically ranges between 15 days and 2 months.
How can I choose the best professional to build my house structure?
You should hire a construction company with proven experience, references from similar projects, and qualified professionals (civil or structural engineers). Request at least 3 detailed quotes that specify materials, construction methods, and guarantees offered. Verify that they have civil liability insurance and are current with their tax and social security obligations.
Got more questions? Contact us!

Got more questions? Contact us!
Frequently Asked Questions
How much does the foundation and structure of a house typically cost?
The average cost is around 130 €/m² of built area, though it can vary significantly depending on the type of structure and materials used. For a single-family home of 150 m², the total budget could range between 19,500 € and 35,000 € depending on whether reinforced concrete, steel, or wood is used. Timber structures tend to be more expensive, increasing the final price by 40-50% compared to conventional concrete structures.
What factors have the most impact on the final price of the structure?
The main factors are the type of material chosen (concrete, steel, or wood), the geotechnical characteristics of the land, and the need for specialized foundation work. The soil type may require deeper foundations or additional reinforcements, which significantly increases costs. The complexity of the design, accessibility of the plot, and local climate conditions also play an important role.
How long does it take to build a house structure?
The average timeframe ranges between 4 and 8 weeks, depending on the complexity and size of the home. The foundation typically requires 2-3 weeks, while erecting the main structure takes another 3-5 weeks. Factors such as adverse weather conditions, soil quality, or supply delays can significantly extend these timelines.
Do I need a building permit to construct the structure?
Yes, it is mandatory to obtain a building permit before starting any foundation and structural work. You must submit a technical project signed by a licensed engineer to your local municipality, along with the required cadastral and planning documentation. Processing time varies by municipality, but typically ranges between 15 days and 2 months.
How can I choose the best professional to build my house structure?
You should hire a construction company with proven experience, references from similar projects, and qualified professionals (civil or structural engineers). Request at least 3 detailed quotes that specify materials, construction methods, and guarantees offered. Verify that they have civil liability insurance and are current with their tax and social security obligations.


